Oxcon/CLL were engaged by Icon to carry out a $4M enabling works package for AUT’s Wakefield Street Development. The scope included:

  • Site clearance;

  • 820m of 900 dia. retention piling and associated RC capping beam;

  • Removable rock anchors;

  • 9000m3 of staged excavation;

  • Shotcrete walls progressively installed in conjunction with excavation;

  • Removable rock anchors installed under Auckland Transport’s road corridor;

  • Soil nails;

  • Site drainage; and

  • The installation of 800m of 1200mm dia. building pilings.

Works were completed progressively and handed over to the structures contractor for the vertical building elements.

 