Wakefield street
Oxcon/CLL were engaged by Icon to carry out a $4M enabling works package for AUT’s Wakefield Street Development. The scope included:
Site clearance;
820m of 900 dia. retention piling and associated RC capping beam;
Removable rock anchors;
9000m3 of staged excavation;
Shotcrete walls progressively installed in conjunction with excavation;
Removable rock anchors installed under Auckland Transport’s road corridor;
Soil nails;
Site drainage; and
The installation of 800m of 1200mm dia. building pilings.
Works were completed progressively and handed over to the structures contractor for the vertical building elements.